Update: 01/14/2011
Test Objective:
To evaluate the pre-C6 changes to PGE11 for replacing the current operational version of C5 PGE11 in the forward processing. Generate 8-day of global L2 LSR product using the PGE11 version 5.3.30 and also generate the downstream daily CMG (MO[Y]D09CMG) and the 8-day composite (MO[Y]D09A1) product from the operational version of the PGE75 and PGE21. Verify and evaluate the changes in PGE11 by comparing the corresponding LSR products from the operational C5 PGEs
Test Period: 2003001-008, 2003193-208
PGE Versions:
Test Version: PGE11 5.3.30, PGE75 5.19
Baseline Version: PGE11 5.3.24
Input DataSet: Use the C5 L1B and cloud mask from the baseline (LAADS AS230) and use all ancillaries and environment used in the baseline